Looking for an ADU builder in Port Angeles, WA? Describe your project once and up to three licensed ADU builders who work in Port Angeles and Clallam County get back to you with a quote. It's free and there is no obligation.
Port Angeles is home to about 20,112 people (2024 Census Bureau estimate), a stable community (+0.8% since 2020). With 1,878 people per sq mi, it is a suburban area. Homeowners here add accessory dwelling units for rental income, family members or a home office.
Port Angeles at a glance
- Population (Census Bureau estimate, 2024)
- 20,112 (+0.8% since 2020)
- Rank in Washington
- 58th of 281 cities and towns
- Land area
- 11 sq mi
- Population density
- 1,878 people per sq mi (suburban)
- Type
- City (Port Angeles city)
- Main county
- Clallam County
What to check before hiring in Port Angeles
- Rules: ADU rules are set by the state and the city; check Port Angeles's planning department for size, setback and parking limits.
- License and permit: in Washington, ADUs are built by licensed contractors under a building permit.
- Utilities: water, sewer and electrical capacity can drive the cost as much as the unit itself.
- Compare: ask for references and photos of ADUs each builder has completed.
Useful official resources
-
HUD User
Federal housing research, including ADUs.
-
ICC: International Code Council
Publisher of the building codes most states and cities adopt.
Services available in Port Angeles
-
Detached ADU
Design and construction of a detached backyard unit, site-built or prefab, with the permit and utilities.
-
Garage or interior conversion
Conversion of a garage, basement or part of the house into a legal accessory dwelling unit.
-
ADU plans and permit
Feasibility, plans and permit application for an ADU before choosing a builder.
Frequently asked questions in Port Angeles
How much does an ADU cost in Port Angeles, WA?
It depends on the type of unit, its size, the finishes and the utilities. Describe your project: builders who serve Port Angeles reply with a quote.
How long does an ADU take?
Often several months for permits and a few more for construction; conversions and prefabs can be faster.
Do I need an architect?
Not always: designers, builders with in-house design or prefab companies can prepare the permit set, depending on local rules.
Which licensed ADU builders will contact me?
Up to three independent licensed ADU builders who serve Port Angeles and the surrounding area, chosen for the service you need. Your details are shared only with your consent.
Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.