Looking for an ADU builder in Virginia Gardens, FL? Describe your project once and up to five licensed ADU builders who work in Virginia Gardens and Miami-Dade County get back to you with a quote. It's free and there is no obligation.
Virginia Gardens is home to about 2,358 people (2024 Census Bureau estimate), a stable community (−0.2% since 2020). With 8,036 people per sq mi, it is a densely built-up area. Homeowners here add accessory dwelling units for rental income, family members or a home office.
Virginia Gardens at a glance
- Population (Census Bureau estimate, 2024)
- 2,358 (−0.2% since 2020)
- Rank in Florida
- 280th of 411 cities and towns
- Land area
- 0.3 sq mi
- Population density
- 8,036 people per sq mi (densely built-up)
- Type
- Village (Virginia Gardens village)
- Main county
- Miami-Dade County
What to check before hiring in Virginia Gardens
- Rules: ADU rules are set by the state and the city; check Virginia Gardens's planning department for size, setback and parking limits.
- License and permit: in Florida, ADUs are built by licensed contractors under a building permit.
- Utilities: water, sewer and electrical capacity can drive the cost as much as the unit itself.
- Compare: ask for references and photos of ADUs each builder has completed.
Useful official resources
-
HUD User
Federal housing research, including ADUs.
-
ICC: International Code Council
Publisher of the building codes most states and cities adopt.
Services available in Virginia Gardens
-
Detached ADU
Design and construction of a detached backyard unit, site-built or prefab, with the permit and utilities.
-
Garage or interior conversion
Conversion of a garage, basement or part of the house into a legal accessory dwelling unit.
-
ADU plans and permit
Feasibility, plans and permit application for an ADU before choosing a builder.
Frequently asked questions in Virginia Gardens
How much does an ADU cost in Virginia Gardens, FL?
It depends on the type of unit, its size, the finishes and the utilities. Describe your project: builders who serve Virginia Gardens reply with a quote.
How long does an ADU take?
Often several months for permits and a few more for construction; conversions and prefabs can be faster.
Do I need an architect?
Not always: designers, builders with in-house design or prefab companies can prepare the permit set, depending on local rules.
Which licensed ADU builders will contact me?
Up to five independent licensed ADU builders who serve Virginia Gardens and the surrounding area, chosen for the service you need. Your details are shared only with your consent.
Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.